Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of standard direct labor-hours. The following events occurred during March:
• 8,600 pounds of sand were purchased at a cost of $7,310.
• 7,200 pounds of sand were used for core tests.
• 840 actual direct labor-hours were worked at a cost of $8,610.
• Actual variable manufacturing overhead incurred was $3,200.
-The labor rate variance for March is:
A) $4,578 unfavorable
B) $1,470 unfavorable
C) $4,578 favorable
D) $1,470 favorable
Correct Answer:
Verified
Q36: Borden Enterprises uses standard costing.For the
Q37: Last month 75,000 pounds of direct material
Q38: Millonzi Corporation has a standard cost system
Q39: Dowen Corporation applies manufacturing overhead to products
Q40: Furson Corporation makes a single product.In a
Q42: Cox Engineering performs cement core tests in
Q43: Tavorn Corporation applies manufacturing overhead to products
Q44: The following data have been provided by
Q45: Hurren Corporation makes a product with the
Q46: Hurren Corporation makes a product with the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents