A review of skilled engineering labor rates and variances at Kumisomo Industries revealed the following: Actual wage per hour was ¥15,000, as opposed to ¥13,000 planned. Actual labor hours per unit produced were 1.2 compared with 1.4 hours planned. If during a period 1,000 units were produced, which of the following is false?
A) The DL wage rate variance is unfavorable.
B) The DL wage rate variance is ¥2,400 favorable
C) The DL efficiency variance is ¥26,000 favorable
D) The DL efficiency variance may be random
E) None of the above is false
Correct Answer:
Verified
Q6: Fegox Firinghi (FF) produces flip flops. Each
Q7: Barb Bubbletop (BB) produces bangles. Each bangle
Q8: Hospital Software sells and installs computer
Q10: Differences between Lean Manufacturing and Standard Costing
Lean
Q10: What is the typical treatment of large
Q12: Materials Quantity Variance: Solving for Actual Quantity
Toddca
Q13: When variances are used as an input
Q14: Fantastic Diapers made 3,000 batches this month.
Q15: Ultimate U-bolts (UU) paid $161,175 for direct
Q16: Standard costs:
A)represent the actual amount spent
B)are standard
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents