The risk of assessing control risk too high is the risk that the evidence of compliance with control procedures in the sample indicates ________.
A) low control risk when the actual degree of compliance does not justify a low control risk assessment
B) low control risk when the actual degree of compliance justifies a low control risk assessment
C) high control risk when the actual degree of compliance would justify a lower control risk assessment
D) high control risk when the actual degree of compliance would justify a higher control risk assessment
Correct Answer:
Verified
Q8: As a result of tests of controls,an
Q9: The purpose of tests of controls is
Q10: An advantage of statistical sampling over non-statistical
Q11: In an auditing context,which of the following
Q12: In addition to population size,which of the
Q14: Which of the following audit procedures is
Q15: Which description best illustrates sampling risk?
A)Applying audit
Q16: Which of the following is a term
Q17: The probability of concluding from a control
Q18: In testing controls over invoices,an auditor discovers
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents