Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed: During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of standard direct labor-hours. The following events occurred during March:
• 8,600 pounds of sand were purchased at a cost of $7,310.
• 7,200 pounds of sand were used for core tests.
• 840 actual direct labor-hours were worked at a cost of $8,610.
• Actual variable manufacturing overhead incurred was $3,200.
-The materials price variance for March is:
A) $860 unfavorable
B) $860 favorable
C) $281 unfavorable
D) $281 favorable
Correct Answer:
Verified
Q55: Hurren Corporation makes a product with the
Q56: The Litton Company has established standards as
Q57: Hurren Corporation makes a product with the
Q58: The Litton Company has established standards as
Q59: The Litton Company has established standards as
Q61: Snuggs Corporation makes a product with the
Q62: Gentile Corporation makes a product with the
Q63: Snuggs Corporation makes a product with the
Q64: Kibodeaux Corporation makes a product with the
Q65: Snuggs Corporation makes a product with the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents