COCOMO is an example of a non-parametric model because it is characterized by a usually unlimited set of named parameters.
Correct Answer:
Verified
Q8: A tangible and verifiable piece of work
Q16: The three major factors in estimating an
Q18: Counting lines of code LOC)is a good
Q20: Research suggests that projects that use a
Q24: Confidence in project estimates will be highest
Q24: Too much detail in the WBS can
Q30: According to the text, most real-world estimating
Q32: One way to ensure that the WBS
Q41: This estimation technique may be driven by
Q43: _ can be very effective and provide