In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?
A) Reducing the requirements in a project rarely affects the time required to finish the project.
B) Increasing the time for the completion of a project always increases the cost of the project.
C) Reducing the number of requirements in a project reduces the overall cost of the project.
D) Increasing the cost of a project can always reduce the time required to finish the project.
Correct Answer:
Verified
Q1: Which of the following is a characteristic
Q2: The Project Management Body of Knowledge (PMBOK®)
Q3: What is the Project Management Body of
Q4: In the Project Management Body of Knowledge
Q6: Systems development projects require the balancing of
Q10: The development of large-scale systems can involve
Q13: Larger projects with longer development intervals will
Q19: What are the trade-offs in a systems
Q31: What are the characteristics of large-scale systems
Q35: Knowledge areas refer to the factors in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents