Tough Hardware purchases raw materials and processes those purchases through a receiving/inspection process prior to stocking for production. Tough places 3 purchase orders for materials for production and receives the goods that day. The first PO is for 2,500 1/2" × 96" milling blanks at $2.75 each. The second is for 4,000 pieces of 48" × 96" × 1" sheet steel at $15.55 each. The third PO is for five 55 gallon drums of Milling Lubrication Oil at $475.00 per barrel.
The receiving/inspection process is completed and the goods are transferred from Receiving Inventory to Raw Materials. The Receiving/Inspection Department assigns manufacturing overhead of $55.00 per purchase order as well as $2.75 per piece on metal goods and $35.00 per container on fluids. All labor is allocated through overhead.
(a) Write the journal entry to purchase and receive these items to Receiving Inventory on account.
(b) Assign overhead to the metal goods.
(c) Assign overhead to the fluid goods.
(d) Transfer all goods to Raw Materials Inventory.
Correct Answer:
Verified
Q166: On August 1, Jones Corporation's packaging department
Q166: Explain the concept of equivalent units. Give
Q167: Zang Co. manufacturers its products in a
Q168: The estimated total factory overhead cost and
Q169: The Brass Works is in the process
Q170: The inventory at April 1, 2012, and
Q172: Job order manufacturing and process manufacturing are
Q174: The inventory at April 1, 2012, and
Q175: The inventory at June 1 and costs
Q176: A firm produces its products by a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents