What results from implementing standard cost systems in manufacturing environments emphasize continuous improvement and just-in-time manufacturing and purchasing?
A) The standard cost system enhances the operational control.
B) The materials price variance may encourage the purchasing department to buy in smaller quantities to reduce inventories.
C) Variances can be computed and presented in reports to higher-level managers.
D) The operational level will benefit from the detailed computation of variances.
Correct Answer:
Verified
Q5: How are costs assigned in a standard
Q6: Which of the following is NOT characteristic
Q7: What do variances indicate?
A)that actual performance is
Q8: How are costs assigned in a normal
Q11: Which of the following are sources of
Q12: Which of the following statements is characteristic
Q13: Which of the following provides both the
Q14: Which of the following standards are based
Q15: During November,10,000 units were produced.The standard quantity
Q50: Why are standard cost systems adopted?
A) to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents