As part of its quality-improvement program a company is conducting a time study for a particular job.The time study encompassed 10 job cycles,and the results include the following cumulative times and performance rating factors for each element.An allowance factor of 16% is assumed.
The normal cycle time for this job would be:
A) 1.809 minutes
B) 2.098 minutes
C) 1.530 minutes
D) 2.233 minutes
Correct Answer:
Verified
Q1: In a time study the standard time
Q2: Work sampling is an easier,cheaper,and quicker approach
Q7: In a time study, the normal time
Q11: A time study is a statistical sample
Q14: _ time is the time required by
Q14: The basic principle underlying an incentive piece-rate
Q19: Work sampling is a technique for determining
Q21: List the steps in work sampling.
Q22: A work sampling study is being conducted
Q23: As part of a time study a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents