Christmas Express makes wreaths in batch sizes of 12.The cutting & assembly process takes 8 minutes per wreath and the decorating process time is 10 minutes per wreath.It takes 12 minutes to move the wreaths from the cutting & assembly process to the decorating process.
(a)Compute the value-added,non-value-added,and the total lead time of the wreath process.
(b)Compute the value-added ratio.Round to the nearest decimal.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q39: Maximum effectiveness and efficiency are reached when
Q40: Maximum effectiveness and efficiency are reached when
Q41: Inventory reduction is a _ principle.
A) lean
B)
Q42: Which of the following is an example
Q43: Which of the following are features of
Q45: Examples of transforming a traditional manufacturing environment
Q46: _ manufacturing philosophy emphasizes quality and zero
Q47: Which of the following drives work-in-process inventory
Q48: Which of the following is characteristic of
Q78: The lean philosophy attempts to reduce setup
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents