Exhibit 3.1
The following questions are based on this problem and accompanying Excel windows.
Jones Furniture Company produces beds and desks for college students.The production process requires carpentry and varnishing.Each bed requires 6 hours of carpentry and 4 hour of varnishing.Each desk requires 4 hours of carpentry and 8 hours of varnishing.There are 36 hours of carpentry time and 40 hours of varnishing time available.Beds generate $30 of profit and desks generate $40 of profit.Demand for desks is limited,so at most 8 will be produced.
Let X1 = Number of Beds to produce X2 = Number of Desks to produce
The LP model for the problem is
MAX: 30 X1 + 40 X2
Subject to: 6 X1 + 4 X2 ≤ 36 carpentry)
4 X1 + 8 X2 ≤ 40 varnishing)
X2 ≤ 8 demand for desks)
X1,X2 ≥ 0
-You have been given the following linear programming model.
MAX: 8 X1 + 5 X2
Subject to: 3 X1 + 5 X2 = 54
11 X1 + 10 X2 ≤ 144 X1 / X2 ≥12
X1,X2 ≥ 0
This formulation:
A) can be solved without preprocessing using LP
B) cannot be solved using LP
C) requires that the third constraint be first converted to a linear form: X1 - 12 X2 ≤ 0
D) must be first converted to a minimization problem
Correct Answer:
Verified
Q58: You have been given the following
Q59: A farmer is planning his spring
Q60: A hospital needs to determine how
Q61: Exhibit 3.1
The following questions are based on
Q62: Robert Hope received a welcome surprise in
Q64: A grain store has six types
Q65: A company is planning production for
Q66: Carlton construction is supplying building materials
Q67: Carlton construction is supplying building materials
Q68: Pete's Plastics manufactures plastic at plants
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents