An assembly line with 28 operations is to be balanced.The total amount of time required for all 28 operations is 39 minutes.The longest operation takes 2.2 minutes and the shortest takes 0.8 minutes.The line will operate for 450 minutes per day.
1. Determine the minimum and maximum cycle time.
2. What is the output rate if the cycle time is set at 2.2 minutes?
A) min cycle time = 0.8; max cycle time = 39; output rate = 204.5
B) min cycle time = 2.2; max cycle time = 39; output rate = 204.5
C) min cycle time = 2.2; max cycle time = 31.2; output rate = 562.5
D) min cycle time = 0.8; max cycle time = 2.2; output rate = 562.5
Correct Answer:
Verified
Q31: A _ layout consists of a functional
Q32: A _ layout is an arrangement based
Q33: CRAFT is a process layout technique that
Q34: All of the following are common objectives
Q38: The typical layout of facilities in a
Q40: The production of large goods such as
Q41: _ is vertical expansion of job duties
Q64: Assembly-line balancing problems involving many distinct products
Q68: A Gallup study showed that workers who
Q72: Virtual teams are empowered work teams that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents