It is not necessary to have a process in control when establishing control limits.
Correct Answer:
Verified
Q19: Special-cause variation tends to be easily detectable
Q72: An R-chart is always analyzed first because
Q74: Poor quality that might result from a
Q75: Larger sample sizes allow smaller changes in
Q76: The lower the rate of defects, the
Q78: A system governed only by common causes
Q79: A c-chart is used to monitor the
Q80: Collecting continuous data is usually easier than
Q81: A manufacturing company has a production process
Q82: Define statistical process control (SPC), and differentiate