When timing a work activity with multiple tasks, the general rule is to take the largest sample size estimate and use it for all activities or tasks.
Correct Answer:
Verified
Q13: A 90 percent learning curve implies faster
Q14: After developing a predetermined standard, stopwatch or
Q15: Allowances include time for all of the
Q16: A performance rating factor (PRF) of 1.15
Q17: The outputs from a work measurement study
Q19: Normal time needs to be adjusted for
Q20: Which of the following is NOT part
Q21: Work standards _.
A) improve motivation if set
Q22: Define and relate normal time and standard
Q23: A method of randomly observing work over