Quick Shop Printing has two workstations, cutting and pasting. The cutting station is limited by the speed of operating the cutting machine. Pasting is limited by the speed of the workers. Pasting normally waits on work from cutting. Each department works an eight-hour day. If cutting begins work two hours earlier than pasting each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but it increases finished units produced each day by 80 units. All units produced can be sold. The cost of operating the cutting department two more hours each day is $800. The contribution margin of the finished products is $3 each. Inventory carrying costs are $0.20 per unit per day. What is the daily capacity of the pasting workstation?
A) 320
B) 400
C) 440
D) 800
E) 820
Correct Answer:
Verified
Q105: When a firm has a bottleneck machine,
Q121: Aunt Lydia's Cookies, Inc., prepares frozen gourmet
Q140: Canevil Unlimited makes small motorcycles.The monthly demand
Q141: Producing more non-bottleneck output
A)creates more inventory but
Q142: Palmateer Industries makes an electronic component in
Q145: Answer the following question(s)using the information below.Speedy
Q147: A company would subordinate all bottleneck production
Q149: Columbus Shipbuilding Ltd. is preparing a bid
Q151: Throughput contribution is equal to revenues minus
Q157: Answer the following question(s)using the information below.Speedy
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents