Answer the following questions using the information below:
Speedy Dress Manufacturing has two workstations, cutting and finishing. The cutting station is limited by the speed of operating the cutting machine. Finishing is limited by the speed of the workers. Finishing normally waits for work from cutting. Each department works an eight-hour day. If cutting begins work two hours earlier than finishing each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but also it increases finished units produced each day by 160 units. All units produced can be sold even though the change increases inventory stock by 20% from 400 units. The cost of operating the cutting department two more hours each day is $1,600. The contribution margin of the finished products is $6 each. Inventory carrying costs are $0.40 per unit per day.
-What is the change in the daily contribution margin if the change is made?
A) $(608)
B) $(634)
C) $(672)
D) $800
Correct Answer:
Verified
Q123: Increasing the capacity of a bottleneck resource
Q126: Acme Janitor Service has always taken pride
Q128: Identifying and minimizing the sources of non-value-added
Q133: Which of the following reduces manufacturing cycle
Q134: Investing in a new equipment,such as flexible
Q136: Longer manufacturing cycle times results in _.
A)
Q138: Answer the following questions using the information
Q139: Inventory carrying costs equal the _.
A) opportunity
Q147: Brix, Inc., prepares frozen food for fast-food
Q148: A machine has been identified as a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents