When using activity-based costing all of the following are true EXCEPT that:
A) all cost drivers should be output unit-level cost drivers
B) there are a great number and variety of cost drivers and cost pools
C) industrial engineering, conference, and regression analysis can be used to estimate slope coefficients
D) the more cost pools, the greater the chance of estimation error
Correct Answer:
Verified
Q123: To implement ABC systems,managers must identify a
Q126: The larger the vertical difference between actual
Q129: To complete the first setup on a
Q130: A step fixed-cost function:
A)is fixed over the
Q133: Machine-hours is a more economically plausible cost
Q134: Economic plausibility is an important criterion for
Q135: Choosing an economically plausible cost driver for
Q136: When evaluating and choosing cost drivers all
Q137: To complete the first setup on a
Q160: A step variable-cost function _.
A) is fixed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents