A person carries a 2.00-N pebble through the path shown in the figure,starting at point A and ending at point B.The total time from A to B is 6.75 min.How much work did the gravitational force exerted on the pebble by Earth do on the pebble between A and B?
A) 30.0 J
B) -30.0 J
C) -56.0 J
D) 56.0 J
E) -36.0 J
Correct Answer:
Verified
Q21: A 1000-kg car is moving at 15
Q39: An object hits a wall and bounces
Q72: A traveler pulls on a suitcase
Q73: When a car of mass
Q74: A crane lifts a 425 kg
Q75: A stone (the system)with a mass of
Q76: A 2.0-kg object (the system)is lifted vertically
Q78: A 500-kg elevator is pulled upward by
Q81: An ideal spring stretches by 21.0
Q82: If 4.0 J of work are performed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents