Using average product cost for a value stream means that individual product costs are not known.Why is this adequate?
A) Waste cannot be eliminated at the activity and process level.
B) A fully accurate product cost is not needed for many decisions.
C) Budget costing variances may actually impede improvement decisions.
D) Detailed variances by department are not needed to eliminate waste.
Correct Answer:
Verified
Q49: Q50: What two types of efficiencies are achieved Q51: Which of the following statements is NOT Q52: What does the lean control system use Q53: How does the income statement reflect the Q55: In calculating product costs for a value Q56: What would cause unit cost to increase Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents