The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead) based on 100% capacity of 80,000 machine hours.The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows:
A) $12,000 unfavorable
B) $12,000 favorable
C) $14,000 unfavorable
D) $26,000 unfavorable
Correct Answer:
Verified
Q102: Assuming that the standard fixed overhead rate
Q155: The variable factory overhead controllable variance measures:
A)operating
Q156: Prepare a monthly flexible selling expense budget
Q158: The standard factory overhead rate is $7.50
Q161: Standard and actual costs for direct materials
Q162: Standard and actual costs for direct labor
Q163: The treasurer of Unisyms Company has accumulated
Q164: Standard and actual costs for direct materials
Q165: The standard factory overhead rate is $12
Q178: Favorable volume variances may be harmful when:
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents