When the control chart shows a repeated series of small observations followed by large observations,the result is referred to as:
A) a cycle.
B) a trend.
C) a level shift.
D) instability.
Correct Answer:
Verified
Q6: In statistical process control,a Type I error
Q7: A new machine can cause a change
Q8: When the Q9: How do we know when a process Q10: Chance variation was built into the produce Q12: If a machine part is slowly losing Q13: If the average run length of a Q14: In statistical process control,a Type II error Q15: Which of the following process results indicate Q16: Variations in a process that are caused