In the production process,when the workers are stationary and a moving conveyor belt takes the product on to the next workstation so that it is assembled in a fixed sequence,this is known as:
A) flexible manufacturing.
B) pull production.
C) mass production.
D) batch production.
E) lean manufacturing.
Correct Answer:
Verified
Q67: James calculates the average number of hours
Q68: A problem associated with total factor productivity
Q69: Shawn,an executive with The Connoisseur's Brewery,wants to
Q70: In the production process,when component parts are
Q71: Labor productivity is calculated by:
A) outputs/direct labor.
B)
Q73: A fixed-position layout is most likely to
Q74: In the typical organization,increased efficiency leads to:
A)
Q75: Labor productivity is most commonly used to:
A)
Q76: In the production process,when the product goes
Q77: A product layout is most likely to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents