Which of the following statements is NOT true about finite capacity scheduling (FCS) ?
A) FCS is an extension of Gantt chart methods.
B) FCS requires that jobs are loaded backward from due dates to determine the capacity required at each work center.
C) FCS assumes that jobs are scheduled through a number of work centers,each with one or more machines.
D) In FCS,attention is paid to scarce resources to facilitate job flow and to improve the performance of the shop.
Correct Answer:
Verified
Q1: Scheduling systems answer which all the following
Q2: For services,the most common priority dispatch rule
Q4: The theory of constraints (TOC)is:
A)A strategic technique
Q5: In the language of theory of constraints,inventory
Q7: Aggregate planning and scheduling differ in that:
A)The
Q8: The overriding problem in batch scheduling is:
A)Regulating
Q9: Critical Ratio is:
A)The ratio of processing time
Q10: A bottleneck is:
A)A resource that has the
Q11: Shortest processing time (SPT)rule means:
A)The job with
Q12: Theory of constraints,as it applies to business
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents