The "Z" value used to calculate the probabilities in CPM analysis is based on the Beta probability distribution.
Correct Answer:
Verified
Q6: Slack activity time is the difference between
Q7: One of the advantages of a functional
Q17: Most project work is controlled by PERT
Q17: In a CPM analysis, if you subtract
Q18: The critical path in a project is
Q20: The work breakdown structure (WBS)defines a hierarchy
Q21: One of the assumptions of CPM is
Q22: When reducing the planned duration of a
Q23: The expected time estimate in a CPM
Q25: In the Time-Cost CPM model,cost is a