The difference between the number of units currently included in the master schedule and the number of units in firm customer orders is often called "available to promise".
Correct Answer:
Verified
Q23: The economic order quantity (EOQ) lot-sizing technique
Q26: Generally, determining lot sizes in MRP systems
Q28: Since MRP systems focus on batch or
Q30: Lot-for-lot (L4L) is the most common lot-sizing
Q32: "Projected available balance" is a term referring
Q33: The least unit cost method (LUC) lot-sizing
Q35: A lot-for-lot (L4L) lot-sizing technique does not
Q53: Which of the following industry types will
Q55: Which of the following industry types have
Q58: The least unit cost method (LUC)of lot-sizing