The controller for Precise Manufacturing has established the following overhead cost pools and cost drivers: Overhead Cost Pool Machine setups Material handling Quality control inspection Other overhead costs Total Budgeted Overhead Cost $300,00080,00090,000150,000$620,000 Cost Driver Number of setups Units of raw material Number of inspections Machine hours
Overhead Cost Pool Machine setups Material handling Quality control Other overhead Budgeted Level for Cost Driver 300 setups 40,000 units 800 inspections 25,000 machine hours Pool Rate $1,400 per setup $2.00 per unit $60 per inspection $10 per machine hour
Order No. 905 has the following production requirements.
Machine setups: 10 Raw material: 13,400 units Inspections: 20 Machine hours: 900 Required: A. Compute the total overhead that should be assigned to Order No. 905 by using activity-based costing. B. Suppose that Precise were to use a single, predetermined overhead rate based on machine hours. Compute the rate per hour and the total overhead assigned to Order No. 905. C. Discuss the merits of an activity-based costing system in comparison with a traditional costing system.
Correct Answer:
Verified
a. tends to eliminate the co...
View Answer
Unlock this answer now Get Access to more Verified Answers free of charge