The connection of two or more flexible manufacturing systems via a host computer and a networking information system is known as
A) yes yes
B) yes no
C) no no
D) no yes
Correct Answer:
Verified
Q111: Managing constraints is a process of
A)backflush costing.
B)design
Q112: Quality inspection points should
A)precede bottlenecks.
B)follow bottlenecks.
C)be placed
Q113: In a Pareto inventory analysis,the items that
Q114: A key element of Japan's success in
Q115: The JIT philosophy indicates that inventory,as
Q117: The flow of goods through a production
Q118: Which of the following areas offers an
Q119: The theory of constraints can
A)identify what limitations
Q120: Flexible manufacturing systems are
A)designed to provide more
Q121: The size of the safety stock is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents