A cost management system
A) is finalized when the information currently being produced is the same as the information currently desired.
B) can be generically designed to fit the information needs of the majority of domestic (but not global) organizations.
C) must be continuously improved to adapt to changes in an organization's internal and external environment.
D) that has been appropriately designed from gap analysis,does not need to be changed unless there is a change in organizational management or culture.
Correct Answer:
Verified
Q40: A management information system should do
Q41: Information about the life-cycle performance of
Q42: Which of the following statements is true?
A)A
Q43: The costs generated by the cost management
Q44: Which of the following statements is false
Q46: A cost management system should
A)identify and evaluate
Q47: Reducing the time-to-market for a new product
A)is
Q48: Which of the following would be considered
Q49: Which of the following is not a
Q50: A cost management system should provide the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents