The difference between actual and budgeted fixed factory overhead is referred to as a fixed overhead spending variance.
Correct Answer:
Verified
Q29: A fixed overhead volume variance is a
Q30: A budget variance is a controllable variance.
Q31: The difference between budgeted variable overhead for
Q32: A flexible budget is an effective tool
Q33: Favorable variances are always desirable for production.
Q35: The difference between actual variable overhead and
Q36: Favorable variances are represented by credit balances
Q37: The difference between the standard hours worked
Q38: A one-variance approach calculates only a total
Q39: An overhead efficiency variance is related entirely