A work center uses kanban containers that hold 200 parts.To produce enough parts to fill a container,60 minutes of setup plus run time are needed.Moving the container to the next workstation,waiting time,processing time at the next work station,and return of the empty container take 120 minutes.There is an overall demand rate of 10 units per minute.Calculate the number of containers needed for this process.
A) 6
B) 7
C) 8
D) 9
Correct Answer:
Verified
Q18: Given the following information pertaining to item
Q19: The seven forms of waste include all
Q20: The basic foundation of the Toyota production
Q21: Which of the following best represents the
Q22: Under a lean thinking philosophy,which of the
Q24: A kanban system cannot be used in
Q25: Kaizen events typically take from one to
Q26: Which of the following is NOT a
Q27: Supplier relationships in a lean system are
Q28: Value stream maps are similar to flowcharts
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents