Which of the following is a tactic for reducing demand pressure on a process bottleneck?
A) Place a quality inspection point immediately before the bottleneck.
B) Decrease the size of batches run through the bottleneck (assuming setup required) .
C) Increase inventory levels at the non-bottleneck resources.
D) All of the above.
Correct Answer:
Verified
Q22: Starting with a due date and scheduling
Q23: A bottleneck should never be blocked or
Q24: A manufacturer of water filtration pumps is
Q25: If the critical ratio of a job
Q26: Which of the following statements about batch
Q28: Concerning dispatching rules,which of the following is
Q29: The greater the workload on a process,the
Q30: Finite capacity scheduling
A) is an extension of
Q31: The theory of constraints says that
A) queues
Q32: Which of the following is NOT typically
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents