Bill is building a project network that involves testing a prototype.He must design the prototype (activity 1) , build the prototype (activity 2) , and test the prototype (activity 3) .Activity 1 is the predecessor for activity 2 and activity 2 is the predecessor for activity 3.If the prototype fails testing, Bill must redesign the prototype; therefore, activity 3 is a predecessor for activity 1.This is an example of
A) Conditional statements.
B) Looping.
C) Having more than one start node.
D) Good network development.
E) Natural network flow.
Correct Answer:
Verified
Q1: The forward pass in project network calculations
Q4: A(n)_ activity has more than one dependency
Q6: The critical path in a project network
Q7: When translated into a project network, a
Q8: The backward pass in project network calculations
Q10: On a project network, the activity times
Q11: Information to develop a project network is
Q32: Which of the following represents an activity
Q35: Which of the following does NOT help
Q38: Which of the following can be used
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents