Bluecap Co.uses a standard cost system and flexible budgets for control purposes.The following budgeted information pertains to 2010:
During 2010,Bluecap worked 28,000 direct labor hours and manufactured 9,600 units.The actual factory overhead was $14,000 greater than the flexible budget amount for the units produced,of which $6,000 was due to fixed factory overhead.In preparing a budget for 2011 Bluecap decided to raise the level of operation to 90% of capacity,to manufacture 9,000 units at a budgeted total of 27,000 direct labor hours.The fixed overhead production-volume variance in 2010 is:
A) $11,280 favorable.
B) $17,280 favorable.
C) $28,800 unfavorable.
D) $34,800 unfavorable.
E) $51,840 favorable.
Correct Answer:
Verified
Q89: Xero Company's standard factory overhead rate is
Q90: At the denominator activity level,Norland Company's total
Q91: Xero Company's standard factory overhead rate is
Q92: Xero Company's standard factory overhead rate is
Q93: Neptune Inc.uses a standard cost system and
Q95: Bluecap Co.uses a standard cost system and
Q96: Neptune Inc.uses a standard cost system and
Q97: Bonehead Co.has the following factory overhead costs:
Q98: Bluecap Co.uses a standard cost system and
Q99: Bluecap Co.uses a standard cost system and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents