A flexible-budget variance for any fixed cost:
A) Is defined as the difference between flexible-budget fixed cost and the level of fixed costs reflected in the master (static) budget.
B) Is undefined,except when actual output equals budgeted output.
C) Is typically zero,because the volume assumed in the flexible budget and the master budget for fixed costs is identical.
D) Is the difference between budgeted fixed cost and actual fixed cost.
Correct Answer:
Verified
Q24: A standard that assumes perfect implementation and
Q39: For control purposes,it is usually preferable to
Q43: Which of the following is not indicated
Q45: The effect on sales, expenses, or operating
Q45: A flexible budget contains:
A)Cost targets based on
Q46: Which of the following is not considered
Q48: For operational control,a management accounting system should
Q49: The direct materials usage ratio for a
Q56: The term "processing cycle efficiency" (PCE):
A) Like
Q59: Which of the following statements about processing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents