Figure TB 17.5 is the DFD of the systems development life cycle as presented in the text.
Required:
Explode bubble 4.0 Structured Systems Design into a Level 1 DFD. All of the process bubbles and data flows are presented below. The data flows for implementation plan and budget and logical specification are listed twice because these data flows will appear twice in the Level 1 DFD.
Process Bubbles
4.1 Specify modules
4.2 Develop implementation plan and budget
4.3 Develop implementation test plan
4.4 Develop user manual
4.5 Develop training program
4.6 Complete systems design document
Data Flows
Approved configuration plan
Approved systems design document
Design specifications
Implementation plan and budget
Implementation test plan
Implementation plan and budget
Logical specification
Logical specification
Training plan
User manual
Correct Answer:
Verified
Q196: _ maintenance adjusts applications to reflect changing
Q197: The _ should describe operating procedures for
Q198: With the _ approach to systems implementation,
Q199: The _ approach forces the users to
Q200: When implementing _ systems, it is often
Q201: Discuss the accountant's involvement in systems
Q202: Discuss four ways that an accountant is
Q203: Briefly discuss application service providers (ASP) and
Q204: Growing State University (GSU) is planning to
Q206: TB Figure 17.3 is taken from the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents