In a work breakdown structure deliverables are ignored and replaced with activities or tasks that have been grouped in phases.
Correct Answer:
Verified
Q9: Responsibility matrices are used primarily with small
Q14: Integrating a project's work packages within the
Q15: For large companies, the organization breakdown structure
Q17: If a project criterion should be optimized
Q61: The hierarchical work breakdown structure can be
Q62: Statements of project scope are sometimes referred
Q63: Basically, the WBS is an outline of
Q70: The intersection of the WBS and the
Q71: A typical responsibility matrix will include not
Q92: Identify and briefly describe the six elements
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents