In a project control chart, four observations trending in one direction indicate there is a very high probability that there is an identifiable cause.
Correct Answer:
Verified
Q1: The baseline is derived from merging information
Q29: All scope changes that result in increased
Q44: Although it is very difficult to measure,
Q53: The units of measure for SV or
Q54: A positive variance in SV or CV
Q55: Milestones are significant project events that mark
Q58: When measuring percent complete in the monitoring
Q59: The best defense against scope creep is
Q60: Cost variance tells us if the _
Q61: What is the difference between a baseline