A process that makes chocolate candy bars has an output that is normally distributed with a mean of 6 oz.and a standard deviation of .01 oz.A job is to be run that requires 200 candy bars.
Determine three sigma control limits for an x-bar chart assuming a sample size of 10.
If specifications are 5.98 to 6.02, what run size should be used for this job so that the expected number of good candy bars is 200, assuming the process is in control?
Correct Answer:
Verified
Q51: A c-chart is used for
A)means.
B)ranges.
C)percent defective.
D)fraction defective
Q61: The process capability index (Cpk) may mislead
Q63: The purpose of control charts is to
A)estimate
Q64: Perform run tests on the given data.What
Q64: If a process is performing as it
Q68: The optimum level of inspection is where
Q70: A town's department of public works is
Q71: Construct the appropriate two-sigma control chart for
Q73: A plot below the lower control limit
Q78: _ variation is a variation whose cause
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents