Bryan Inc. produces a specialty top-quality juice machine. The product, the JM50, requires four processes to be completed. Specifically, these processes are exterior construction, pulp filter insertion, painting, and packaging. Each process is performed at separate workstations with different completion rates:
Exterior construction can manufacture 100,000 juicer exteriors per day.
Pulp filter insertion can install 25,000 filters every 6 hours.
Painting can decorate 3,000 juicers every half hour.
Packaging can package 5,000 juicers per hour.
The plant operates 24/7, 24 hours a day every day of the week.
Which function(s) is/are the bottleneck(s) ? (Assume an average 30-day month.)
A) Exterior construction.
B) Pulp filter insertion.
C) Painting.
D) Packaging.
E) Exterior construction and pulp filter insertion.
Correct Answer:
Verified
Q49: Place the phases of the cost life
Q50: Quality Chairs Inc. (QC) manufactures chairs
Q51: Quality Chairs Inc. (QC) manufactures chairs
Q52: During the sales life cycle, which is
Q53: Which of the following is a common
Q55: Quality Chairs Inc. (QC) manufactures chairs
Q56: During the sales life cycle, which is
Q57: Which of the following phases are
Q58: When comparing Activity-based costing (ABC) and the
Q59: Target cost can be defined as:
A) Manufacturing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents