Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: During 2019, Bluecap worked 28,000 DLHs and manufactured 9,600 units. The actual factory overhead cost for the year was $14,000 greater than the flexible budget amount for the units produced, of which $6,000 was due to fixed factory overhead. In preparing a budget for 2020 Bluecap decided to raise the level of operation to 90% of capacity (a level it considers to be "practical capacity") , to manufacture 9,000 units at a budgeted total of 27,000 DLHs.
The total budget for fixed factory overhead in 2019 for Bluecap Co., to the nearest whole dollar, was:
A) $230,400.
B) $259,200.
C) $265,200.
D) $276,480.
E) $288,000.
Correct Answer:
Verified
Q66: The following budget data pertain to the
Q67: Bonehead Co. has the following factory
Q68: The following information for the past
Q69: The following information for the past
Q70: The following information for the past
Q72: The following information for the past
Q73: The following information for the past
Q74: Bonehead Co. has the following factory
Q75: The following information for the past
Q76: Bluecap Co. uses a standard cost
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents