The materials price variance is:
A) $420 F.
B) $420 U.
C) $700 U.
D) $700 F.
Correct Answer:
Verified
Q76: The following labour standards have been established
Q77: In a certain standard costing system the
Q78: The following standards for variable manufacturing overhead
Q79: The Reedy Company uses a standard costing
Q80: The direct labour efficiency variance for March
Q82: The material quantity variance for November was:
A)
Q83: The labour rate variance for January is:
A)
Q84: To record the incurrence of direct labour
Q85: The labour efficiency variance for November was:
A)
Q86: The total variable overhead variance for November