What is an auditor's evaluation of a statistical sample for attributes when a test of 100 documents results in 4 deviations if the tolerable rate of deviation is 5%,the expected population deviation rate is 3%,and the allowance for sampling risk is 2%?
A) Accept the sample results as support for planned reliance on the control because the tolerable rate of deviation less then allowance for sampling risk equals the expected population deviation rate.
B) Modify planned reliance on the control because the sample rate of deviation plus the allowance for sampling risk exceeds the tolerable rate of deviation.
C) Modify planned reliance on the control because the tolerable rate of deviation plus the allowance for sampling risk exceeds the expected population deviation rate.
D) Accept the sample results as support for planned reliance on the control because the sample rate of deviation plus the allowance for sampling risk exceeds the tolerable rate of deviation.
Correct Answer:
Verified
Q39: Which of the following statements is correct
Q40: Which of the following is not true
Q41: Mary Todd is auditing White House Furniture.In
Q42: The maximum rate of deviation that may
Q43: When an auditor increases the assessed level
Q45: An auditor is examining an important internal
Q46: Assume that the audit team established a
Q47: Lincoln,CPA,selected a sample of 100 items by
Q48: The allowance for sampling risk was:
A)5.5%.
B)4.5%.
C)3.5%.
D)1%.
Q49: Which of the following is not true
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents