With the backyard poultry craze unleashing a tidal wave of municipal code proposals,Chickenverks is poised to capitalize on the sudden demand for chicken tractors.The portable henhouses they have designed can be assembled in 10 basic steps,each with a required time and predecessor as shown in the table.There are 8 productive hours available in a day and the manufacturer wishes to produce 40 units per hour.
Balance the line according to the longest operation rule and calculate the percent idle time.Using the same arrangement of tasks at work stations,what is the greatest output that can be achieved in an eight-hour day and what is the percent idle time of this design?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q52: The three dimensions of service positioning are
Q61: The table depicts a production line that
Q62: A manufacturer needs to produce 300 coffee
Q65: Use this scenario for the following
Q67: These three tables show the floor layout
Q69: The table depicts a production line that
Q70: The table depicts a production line that
Q73: Use this scenario for the following
Q85: Use this scenario for the following
Q100: A collection of different departments must be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents