Which of the following is an IT general control that would most likely assist an entity whose systems analyst left the entity in the middle of a major project?
A) Processing controls.
B) Input and output validation routines.
C) Systems documentation.
D) Error controls.
Correct Answer:
Verified
Q68: After obtaining an understanding of internal controls
Q69: All of the following are significant deficiencies
Q70: Before applying substantive procedures to the details
Q71: As the acceptable level of detection risk
Q72: The auditor should consider all of the
Q74: The normal sequence of documents and operations
Q75: Based on a study and evaluation completed
Q76: After the auditor has prepared a flowchart
Q77: A procedure that would most likely be
Q78: The auditor's communication of material weaknesses in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents