ABC,Inc.,is a small clothing manufacturer that produces shirts and pants using two resources: sewing machine hours and cutting machine hours.The production manager can schedule up to 240 hours of sewing machine time and up to 150 hour cutting machine time.Production of one shirt requires 3 hours of sewing time and 1 hour of cutting time.Each pair of pants requires 2 hours of sewing time and 1.5 hours of cutting time.Each shirt yields a profit of $5,and each pair of pants generates a $6 profit.The objective is to maximize profits.Determine cutting time constraint for the LP formulation.Let X₁ = Number of shirts to be produced,X₂ = Number of pairs of pants to be produced.
A) 3X₁ + 2X₂ ≤ 240
B) X₁ + 1.5X₂ ≤ 150
C) 3X₁ + 2X₂ ≤ 150
D) X₁ + 1.5X₂ ≤ 240
Correct Answer:
Verified
Q12: The resource constraints are modeled in LP
Q13: In linear programming,maximizing profits or minimizing costs
Q14: Which of the following is FALSE about
Q15: Which of the following is NOT one
Q16: _ in linear programming are an alternative
Q18: Using linear programming (LP)to determine the optimum
Q19: Determining the shipment of goods from multiple
Q20: ABC,Inc.,is a small clothing manufacturer that produces
Q21: ABC,Inc.,is a small clothing manufacturer that produces
Q22: ABC,Inc.,is a small clothing manufacturer that produces
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents