A final assembly schedule is a part of the MPS in which manufacturing environment?
A) ATO
B) MTO
C) MTS
D) ETO
Correct Answer:
Verified
Q7: Uncommitted inventory that is physically on-hand is
Q8: To facilitate production,it is necessary to _.
A)aggregate
Q9: The output of the master schedule is
Q10: The current time bucket lies in which
Q11: The time intervals used in master scheduling
Q13: Operations plans in the medium to short
Q14: The effectiveness of a master schedule depends
Q15: The planning horizons of master scheduling are
Q16: Which of the following is relevant to
Q17: The master schedule reflects demand from _.
A)final
Unlock this Answer For Free Now!