Multiple Choice
If more than three tons of sand are needed, _____ should be allowed for waste.
A) none
B) 1 ton
C) ½ the estimated sand
D) ½ ton
Correct Answer:
Verified
Related Questions
Q1: When estimating blocks with a square feet
Q2: Water does not require estimating as a
Q3: Be conservative when estimating sand, as storage
Q4: Since one concrete block measures _ in
Q5: The ratio of block to feet in
Q6: Labor costs for block work are affected
Q7: Estimating by determining the number of Chapters
Q8: One ton of sand is needed for
Q10: Estimating by rule of thumb can be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents