A multi-step, sequential process used to design HRD interventions is called:
A) PDAC (plan, do, act, check)
B) PDCA (plan, design, check, assess)
C) ADImE (assess, design, implement, evaluate)
D) SADIE (survey, access, develop, implement, evaluate)
Correct Answer:
Verified
Q42: An undesirable by-product of the factory system
Q43: An ongoing process where an individual progresses
Q43: The two significant historical events that impacted
Q46: The Smith-Hughes Act of 1917 granted funds
Q46: The Smith-Hughes bill was passed in:
A)1809
B)1917
C)1872
D)1907
Q47: The Human Relations movement began in the:
A)Late
Q48: A staff organization generally:
A)Gives direct orders to
Q57: The four step instructional training method introduced
Q59: The introduction of the model T assembly
Q60: The HRCI offers which of the following
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents