The process design team at a manufacturer has broken an assembly process into eight basic steps,each with a required time,and predecessor as shown in the table.They work a 7 hour day and want to produce at a rate of 360 units per day.What should their takt time be?
A) 70 seconds
B) 65 seconds
C) 52 seconds
D) 25 seconds
Correct Answer:
Verified
Q1: The Devon Tower graces the Oklahoma City
Q3: A manufacturing process decision affects:
A)the type of
Q3: Which of these manufacturing processes is most
Q14: The time between completions of successive units
Q15: The manufacturing process used to make a
Q32: A cellular layout is essentially the opposite
Q35: Products that use standard components but the
Q38: Assemble-to-order occurs upstream from:
A)design.
B)material sourcing.
C)fabrication.
D)finishing.
Q41: In a service blueprint,the two layers the
Q50: The point where the customer interfaces directly
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents