In detailed production scheduling,longer production runs of a particular product:
A) Increase the available capacity by reducing the frequency of setups.
B) Increases finished goods inventory levels.
C) Reduces finished goods inventory levels.
D) Both a and b.
E) Both a and c.
Correct Answer:
Verified